Quote:
Originally Posted by WiredGuy
And make sure they give you a very detailed excel (or other) spreadsheet of contact info, the terms of the link exchange, etc. etc. Nothing worse than when he stops working you have no idea what the terms of each deal were.
WG
|
Yep. I forgot that on my check list. But a tracking report, or sheet of what you have done, or whatever. Something where I can trace back links, and work hours claimed, and so on if needed to.
Always best for BOTH sides to have accountability.