erection of a building isn't the hard part if all the parts fit properly. that takes a very good steel fabrication shop and a very good detailer (the person who makes the detailed plans and drawings). considering it went up that quickly i'm assuming they had both. they also preassembled everything before it even reached the job site. you can see them doing the ducting, wiring, and lighting in the shop. lets not forget that this building was a monotonous box as well. it's not like they were putting up a dome or radius beams in some sort of extravagant lobby or something.

so what i'm trying to say is there was a fuck ton of work done on that building that took a lot longer than 15 days to get it to go up that smoothly. either way it's always cool seeing the finished product of hard work.
dynastoned is offline   Share thread on Digg Share thread on Twitter Share thread on Reddit Share thread on Facebook Reply With Quote