View Single Post
Old 01-10-2012, 02:15 PM  
Rochard
Jägermeister Test Pilot
 
Rochard's Avatar
 
Industry Role:
Join Date: Dec 2001
Location: NORCAL
Posts: 73,062
Quote:
Originally Posted by georgeyw View Post
Was it a concrete building? How does the concrete support the weight when it has not had timeto cure properly?
It seemed to be mostly steel. The would put up steel beams to hold the floor above it, hundreds of them, and then had two special cranes just seemed to pour concrete - They were like fifteen stories tall and instead of a cable with a hook, it was a flexable pipe that seemed to pour concrete or something similar. Then they would lift up these huge prefab pieces. It was amazing really. I never saw something like that.
__________________
“The choice is no longer between right or left. The choice is between normal and crazy.”
- Sarah Huckabee Sanders

YNOT MAIL | THE BEST ADULT MAILING SOLUTION
Rochard is offline   Share thread on Digg Share thread on Twitter Share thread on Reddit Share thread on Facebook Reply With Quote