Quote:
Originally Posted by Spudstr
Look I'm just trying to help. But its pretty apparent that no one appreciates feedback that goes against their own thinking/mentality.
|
That isn't true - I do appreciate constructive feedback. That adaptec card is no longer in there (I copy/pasted that from the orig invoice when there were 12x2TB drives in there).
To grow to 24, the card was replaced along with something else I forget. I'd have to dig through the emails to find what exactly it was, but I cannot be bothered. Suffice it to say, to scale from 12 to 24TB cost the price of buying 12x2TB server-grade disks. This server can scale to another 48 without haste, so I believe, with the possibility to grow that to 2x96 if required. I'll cross that bridge when I come to it, but for now, we're a long way off filling 24TB, which is a shitload of content.
The hw side of things I leave to others who are better qualified and in the know than I - I know my limits.
But thanks for your constructive feedback.
