Quote:
Originally Posted by Mike Dutch
interesting thread, what time frame should it be build in, so you have documentation on functionalisties (frontend and Backend) / [DB] connections/layouts with current systems and such already?
|
we can do it within a month which includes:
1) custom graphics design made by professional graphics artist
2) integration of that graphics design
3) integration with payment system
4) installation
if you have graphics design ready (Photoshop PSD files would be enough) we can do it in 2-3 weeks.