View Single Post
Old 09-24-2020, 02:25 AM  
pimpmaster9000
Too lazy to set a custom title
 
pimpmaster9000's Avatar
 
Industry Role:
Join Date: Dec 2011
Posts: 26,732
Quote:
Originally Posted by Ferus View Post
Depending on how you want to build it, a 100m2 pool still need a concrete floot, so lets say you go easy and only want 15cm walls, you are at 15 m3 of concrete = 60 * 15 = €900 alone for the concrete.

For steel, you need 500-700kg for the floor alone = uppps the €500 I told you
8 mm dimensions in sections of 2350x5000 mm 150x150 mm masks, is 62.5 kg each


And then comes the ICF.. those are NOT cheap

Then comes the painting or surface treatment

and are you and your slav army gonna dig the hole by hand to keep cost down?

What about around the pool? gonna just let gras or gravel fall into your pool?
I said the ICF is like 3000$ for 100m2 walls for a house...a pool is not as deep as a house...the ICF takes 12cm concrete not 15cm...they build pools with it no problem...a digger is 2$/m3...too lazy to work out how much for the pool...around the pool is polished concrete thing...dirt cheap...too lazy to work it out...it is pennies...too lazy to even remember what they told me LOL...

feel the power of the 3rd world!...I watch "Grand designs" on youtube and laugh...it is so absurdly expensive to build in the west...
__________________
Report a suspicious cracker: Click Here
pimpmaster9000 is offline   Share thread on Digg Share thread on Twitter Share thread on Reddit Share thread on Facebook Reply With Quote