Quote:
Originally posted by Fletch XXX
would the contract even hold up between separate countries?
I wouldnt really care about 3-5 weeks to be honest, I mean shit, do you think designers sit around knocking off everyone? Fuck, I could have released soooo many sites ahead of the programs I have worked for ;)
if the photoshop "almost done" whats the deal about a designer signing if its done?
|
a good portion of the photoshop work is done but there still would require a good amount of work needed in regards to layout and tweaking things as it moves towards the final launch.. if i could find an indivdual to do both php and photoshop it would cut 50% of the worries..
and for this i would go with a reputable designer like yourself or eroswebmaster who is already respected and not someone who has already spammed my icq since this thread has started with "I do good design" lol